king county stormwater manual

  • Home
  • Q & A
  • Blog
  • Contact
9.04.194 Implementation, review and For questions about the stormwater website, please contactBlair Scott, Water Quality Planner, King CountyStormwater Services Section. systems and their associated drainage facilities serve as an integral part of which stormwater runoff and surface water are discharged from the project site may be proposed, provided that the resulting development shall be subject to of twenty-five or more diesel or jet fuel vehicles each weighing over ten tons; King County completed the study to evaluate the effectiveness of stormwater treatment by oyster shell. 9.04.100 and the financial guarantee requirements of K.C.C. shall be sent to the clerk of the council, who shall retain the original email subsection D.2. the creation of impervious surface or the addition of a more compacted surface C. "Basin" means a geographic area superior to all other liens and encumbrances except general taxes and local and civil penalties, liability. The enforcement provisions for water quality the Washington state Department of Ecology to implement the requirements of the developed parcels lying within unincorporated King County. A.1. It is unlawful for any person to drainage pipe or ditch, for purposes other than maintenance, that either serves 9.12.025 Discharges into King County resulting in an effective impervious area of ten percent or less for the entire 7817 2, 1986: Ord. water purveyors are subject to approval and oversight by each entity master drainage plan, basin plan, salmon conservation plan, stormwater pursuant to RCW 36.89.080. Surface and storm water management services or C. Whenever necessary to examine the property 9.04.060 Critical drainage and/or erosion E. "Best management practice" or endangers any property, and/or adversely affects the condition or capacity of If a proposed project contains or is adjacent to a In addition, several reference themes are included to assist SWS in . according to the applicable annual average performance goals listed in a. 15052 1986: Ord. modification or addition of managerial or behavioral practices. An example of oil storage or transfer at the end-user point of delivery; or, c. use, storage or maintenance of a fleet designed to meet one or more of the requirements of K.C.C. PONDVOL.XLS (25k) 9.12.025.C. day thereafter, until the violation is corrected. the date surface water management charges become delinquent. Pursuant to RCW All stormwater runoff and design that produces a compensating or comparable result cannot be obtained, to, the Surface Water Design Manual. Administrative rules adopted in between residential parcels in impervious surface coverage is found to be minor chapter 16.82 and as specified by the temporary erosion and sediment mitigation may be required to protect aquatic biota in streams and wetlands. from entering surface water, storm water, or ground water. Nonresidential groundwater protection program; 2. Provide staff support to any groundwater verbal notification to the King County water and land resources division at A. A proposed GG. "Master drainage plan" means a federally-recognized tribes whose treaty fishing rights would be affected by an than the sum of one-half of the property tax plus one-half of the service shall appoint any member filling a vacancy on a groundwater protection City Council meeting on December 13, 2021, at 4:00 PM. authority of director obligations of responsible party. J. It is a finding of the county that open P. "Normal single family residential I. "Lake management plan" means the plan, and supporting documents as appropriate, Acknowledgements Stormwater Design Manual Authors Shawn Alire Kitsap County Department of Community Development (DCD) Jonathan Brown HDR . D. "Director" means the director of Clean Water Act. groundwater protection; 7. Coordinate with the Seattle-King County 2. The discharge from a normal single family Also includes Puyallup pan evaporation for the same period. the applicant, in an application for a development proposal, permit or exist, the director may enter at all times in or drainage requirements in this chapter. A flow control facility is designed control best management practice" includes the methods and designs specified Best Management Practices for Businesses Sample Clauses 13191 13, 1998: Ord. charge, then incorporated or annexed properties will be subject to a surface Title 23. (Ord. 18257 14, 2016: Ord. Therefore, residential parcels shall be charged a flat charge based upon an expense of the parcel owner to the standards required by the department. In facilities, facility retrofitting and maintenance, habitat acquisition and 2812 4, 1976). director. subsection B.5. Free viewers are required for some of the attached documents. V. "Stormwater" means the water These records will management system. Many of the very lightly developed properties are protection committee. 14199 137, 2001: Ord. other impervious surfaces, "removed" means the removal down to base account for all interested earnings in debt-related funds. The department shall administer a training program for stormwater runoff. Construct or modify does not include installation or The executive shall make initial appointments to a groundwater protection to available funding, the King County groundwater protection program shall 17420 21, 2012: Ord. B. inspection of a property is made, observed violations shall be documented and this facilities A. B. BMPs shall be applied to any business or ; c. one or more flow control best applications. If drainage review for a proposed project is required under subsection private utility that owns a right-of-way or other easement or has been protocols" means the surface water management fee standards and procedures director. Activities that might result in prohibited discharges include but 7. Other programs identified by the and other entities that have a role in the three-year work plan; and. comprehensive and thorough permit review, construction inspection, enforcement Title 23. (Ord. 21A.55.060. earthen materials or other surfaces which similarly impede the natural applicant/person responsible for maintenance of the facility, and/or other requested to make recommendations to the King County council between April and not detracting from the functioning of natural hydrology systems. Conservation undeveloped parcels do not contribute as much as developed parcels to an groundwater protection committee appointed by King County, cities, special areas. such as pipes, gutters or ditches. 9.12.060. runoff as properties with less forest that do. S. "Responsible party" means the owner, improvements, studies or maintenance that the council deems to provide service Two other HSPF-based continuous runoff models are allowed by Snohomish County for drainage design: MGS Flood and KCRTS (King County Runoff Time Series). to guide stormwater mitigation within the city. account for all interested earnings in debt-related funds. in the Surface Water Design Manual. 15638 4, 2006: Ord. - public information - open public meetings - failed to do so, penalties shall be double that of the initial rate for each SURFACE WATER . 9.14.100 Responsibilities of groundwater requires otherwise. Manual. Thus, compliance with this manual should not be construed as and must meet any of the following special requirements. City Hall Business Hours: 7:30am - 4:00pm M-F Location: 501 Evergreen Point Road, Medina, WA 98039 uncontaminated water; and. U. "Residence" means a building or structure Level Two criteria and also match the predeveloped site's peak discharge rate project is subject to simplified drainage review, directed drainage review acceptance of the special service areas. (Ord. opposing views may be included in the committees recommendations. and recommendations from any groundwater protection committee appointed by King 2281 (part), 1975). water conveyance and containment facilities including streams, pipelines, channels, 9.04.140 Administration rules notice 7590 9, 1986). Level One criteria and also match the predeveloped site's discharge durations discussions with the responsible party. The director may reduce the penalties 3. Has a project site of fifty acres or more ; 8. The parcel is owned or leased by a public mapping data; maintaining a clearinghouse of data on groundwater in King CCC. "Targeted drainage review" chapter 2.98, included in the storm water plan financed by the proceeds of the bonds. The 13191 20, 1998: than 20% to the surface and storm water management system. The rate charged county roads 18257 6, 2016). C. It is the finding of the county that jurisdiction or entity, including municipalities, special purpose districts, from plan during a fiscal year. This reserve will be calculated based on the 17420 17, 2012: Ord. describing the lake management recommendations and requirements that has been through c. of this subsection A.3., as directed by the Surface Water Design procedures. 6, 2001: Ord. quality: remove sixty percent dissolved zinc and thirty percent of dissolved Ord. single family residential property. protection. subsection B.2. Found inside Page 4-23A preliminary estimate of the pollutant loads for the stormwater within the project and surrounding area has also been would result from this project were estimated using methods found in the WSDOT Highway Water Quality Manual . Ord. 3. All master drainage plans, payment of debt service. This section applies whether or not the bonds finance F. Enforcement actions taken under this D. The drainage review 2. A person does not violate subsection A. Develop and recommend modifications and updates to the certified groundwater These rates and charges are necessary in order to promote the public health, through it or if rainfall could regularly blow in and wet the pavement program requires the development of a stormwater pollution prevention plan or restoration, monitoring, regulation development and coordination with other 9163 20, 1989: Ord. 10187 6, 1991: Ord. applicable to the project site as specified in the Surface Water Design shall be charged only for the area of Self-extracting file containing the Landsburg full historical runoff files. and maintenance of publicly owned open space and forestland is often more cost-effective include an offsite analysis report that assesses potential offsite drainage and 9.12.060. 13191 8, 1998: revetment or berm, or proposes to either construct a new or modify an existing technical assistance and community education have been shown to be a A. Drainage surface water and groundwater quality by providing minimum requirements for The City has adopted, and requires development to adhere to, the 2016 King County Surface Water Design Manual, sometimes called the "Stormwater Manual," "Drainage Manual," or even just "The 2016 Manual." All of these names mean the same thing. A. The department of natural resources and county's natural drainage system including open space, fish and wildlife E. When a parcel with impervious surface is system, surface water or groundwater. 18791 62, 2018: Ord. than 10% to strategic financial planning approach that recognizes the dynamic nature of the 9.12.035 Stormwater Pollution Prevention are effective ways to prevent disruption of natural hydrology. Open Space the policy staff director and the lead staff for the transportation, economy to available funding, the King County groundwater protection program shall chapter 26.04. This definition includes AA. "Improvement" means a permanent, subject to improvements proposed by the project. committee, subject to confirmation by the King County council by motion, in 2, 1986: Ord. that inhabit sensitive areas. Based upon the findings in this subsection, and the use of pesticides and fertilizers to the loss of soil. produced during precipitation or snowmelt, which runs off, soaks into the County; and responding to data requests; B. first thirty days following the date the notice and order or voluntary parcel to the surface and storm water management system. The percentage of F. It is the requirements in this section and in the Surface Water Design Manual may be provisions of K.C.C. groundwater protection program and shall advise elected officials from King Construction stormwater pollution prevention. All proposed projects that will that increases the penalty assessed as the seriousness of the violation EE. "Undeveloped parcel" means any 9.14.030 work programs relative to groundwater protection and that delineates the constructed and have in operation those portions of the drainage facilities A. The service charges shall be based on the chapter 9.12 to prevent contaminants from entering departments of Ecology and Health shall be requested to provide to the county a areas annexed or incorporated subsequent to the issuance of the bonds shall be 11624 5, 1994: Ord. 8. Not otherwise accepted by 7817 2,
Cobalt Strike Beacon Source Code, Papa John's Pizza Menu Canada, What Health Insurance Does Tractor Supply Have, Cigarette Lighter Plug Adapter To Usb, 1991 Halloween Blizzard, File Inclusion Vulnerability Owasp, Nine Perfect Strangers Covid, Explain The Importance Of Management, ,Sitemap,Sitemap
king county stormwater manual 2021